top of page
LINE PUMP.jpg

TERMS & CONDITIONS

LINE PUMP HIRE 

CANCELLATION FEE

  • A late cancellation fee will apply when reasonable notice is not given. A late cancellation fee (equal to the applicable minimum hire charge) will apply when the concrete pump is on-site or en route. Reasonable notice means a minimum of 24 hours notice, unless due to weather.

  • Penalty Rates will apply Monday to Friday when pumping commences before 6 am or when pumping continues after 4 pm, or when pumping continues after 11 am Saturday.  This penalty rate, which is additional to normal rates of hire, is $50.00 per hour.

  • Sunday & Night rates. An additional $50.00 per hour on top of normal rates.

  • Additional Pipe. It is the responsibility of the customer to advise if additional pipes/rubber hose will be required in advance

 

CUSTOMERS RESPONSIBILITY

  • Type of job site; residential, commercial or industrial

  • Provision for Clear site access and provide an adequate hard stand surface (Road plates to be provided by the customer if required)

  • Specify clearances from power lines or have the power disconnected and/or tiger tails installed.

  • Specify concrete to suit the type of concrete pump ordered. Minimum 20 mpa

  • Towing from site to hard standing ground if it is required at customers cost

  • Traffic control or road closure permits for concrete pump setup and operation if required

  • Notify if concrete strength ordered is above 25 mpa or additives have been requested

  • Suitable washout area to comply with Council and EPA Guidelines and Regulations

  • All footpath and pedestrian protection by way of fencing and signage

PAYMENT

  • Cash on Delivery or Bank Transfer within 7 days of providing the service

  • Late payments may incur late payment fee

  • Any outstanding invoices are made claimable under the Building & Construction Industry Security of Payment Act 1999

PO Box 6193, Rouse Hill, NSW 2155

E: admin@piercretegroup.com.au   

PH: 0488 332 247

Head Office
bottom of page